I have always done most of my warm weather cooking outside. It saves a ton of money on the electric with the heat in the kitchen not being compensated for and fought by the A/C. It also prevents having to turn the A/C when the passive cooling of breeze, shade and updrafts can do the job of keeping it cool to a point.

So for the new house I am building I decided to go all out on a patio with a large summer kitchen.

I Dug the patio area out 6″ deep and it will be 20′ x 50′ Fiber Concrete slab 2″ of rock under 4″ of Concrete.

A lot of dirt comes out of a big 6″ Deep Rectangle :)
DSC00209.JPG

So hot the last couple days even Poo is miserable :)
DSC00210.JPG

I am going to incorporate two good size post oak stumps into the patio. I have to bring the pressure washer down and blow all of the dirt and rocks away from the stump bases 6-8 inches below the dug out level line. Then use a carbide chain on the saw to cut out as many roots under the stumps as possible, without cutting the big tap roots. I will probably just use a couple of 5 gallon buckets of heated hot tar in the hole around and under the stumps. LOL I could just cut the tap roots and push the stumps out with a tractor but I think the stumps will look neat.
DSC00211.JPG

DSC00212.JPG

I dug it all out with my little Kubota BX25D with the bucket. I will dig around the stumps with its backhoe to rip up as much of the root ball as I can. The little backhoe is only good for 2-2 1/2 inch diameter roots. The big roots require the chainsaw and cutting them into sections that the bakhoe can handle.
DSC00215.JPG

I have 25 tons of #6 rock coming tomorrow to spread in 2″ level layer and the concrete spinners will arrive in 2 weeks. Earliest I could get the trucks in. Every regional concrete company is swamped the I 57 project and my two most local are running concrete to the coal mine nonstop as well at the interstate rework.

I drilled the holes and poured the footers out of my cement mixer yesterday to plant four 6x6x10L post on the front. They will hold the rafters for the lean to off the top of the house under the gutters. 2′ under the ground and encased in the concrete on the top. And the rafters topped with the same color steel on the roof of the house. Will drop from 9′ 6″ on the house to 8′ on the outside.

After the concrete is solid and cure I am going to build a 36″ block wall around it with a 8′ double gate opening center front and top the holes with 2″ thick patio pavers. Frame it in a bit and put the same screen material on it that I used on the commercial kitchen porch.

For the kitchen part I am going to take the legs off of one of my Oklahoma Joe’s Smokers that has a wood/charcoal side and a Propane Grill side, One of the Blackstone flat tops, the Big 8′ Propane charbroiler, the smaller 4′ wood charbroiler. And build them into the North wall and part of the east wall. Then build a stone wood fired oven. I am tinkering around with welding a steel box together and a diamond mess cover over it with 6 propane burners in it. Got too hot to be dicking around with the torch and the welder in the shop though. I may skip the big gas charbroiler and just run with the 4′ wood burner. I did get a 20′ long 4 fan hood/exhaust unit riveted together to put in over the the North end cooking area to vent the smoke out through the roof. LOL That sucker moves some air! I might have gone a little overkill using 4 greenhouse intake fans….. Might reduce them down to 2 of smaller intake fans. (They pull air from outside a high tunnel or greenhouse and circulate out the opposite end through the exhaust ports.) So will work fin for using them as hood fans LOL.

I am pretty much stripping the grills, smokes and flat tops out of the Chuck Wagon Food Trailer and installing them in the patio kitchen.

Going to finish the project up by bolting some table tops to the stumps and putting 2 good size ceiling fans in and some LED Lighting up in the rafters.

And that is project #1 of concrete week. Project #2 is pouring a perm 6′ x30′ 6″ thick pad for the new sawmill to sit nice and levels on. And #3 a 20’W 50′ long 4″ pad out at the Lake Recreation area to move my cabin over to and slide it off on. LOL and I am Renting a Power Trowel for Concrete Week! All total 27 yards of concrete or 4.5 loads. AND I AM NOT going to work it all by myself like I did with the 22 yards in a day! I have recruited a couple of friends to come help that week in exchange for beer and food (NOT BUD or anything else Inbev makes, not going to have Qweer Beer EVER not that I ever would have anyway. )

My current outdoor kitchen is just a Oklahoma Joe’s and a Blackstone flat top under the Krap Kave Kanopy and a fire ring that my dutch ovens can hang over or sit in. I love my Black Stones! I can cook huge meals on them and they take about 3 minutes to clean after and be all shiny and oiled up for the next time. I did get a little 12″ table top one for when I am only cooking for myself and Mrs Krap.

I hate taking a week away from working on the house interior but I can only get the the heavy trucks in July through September. Getting the concrete work done sooner rather than later and out of the way……… Seems like the best plan to me. Going balls to the wall to get the Master Bedroom, Bathroom and The Corner room finished. We can move in with those 3 rooms complete. Have to get moved out of the Cabin and the Cabin emptied out and moved to the lake before the end of September, the Cabin qualifies as a heavy truck load, it weighs 30,000 pounds empty and is 16′ W x 48′ long. A friend started a portable building moving company and offered to mover the mile out to the lake for $500 which is a lot less than the other quotes I got that range from $2000-$2500. I suspect his Discount will involve food and beer :) I can move things like the containers around with my GN and Winch but the GN is pushing the limit with 16,000 pounds on it and no way mine can handle 30,000 pounds. He has a semi with a 48′ lowboy flat bed that extends out and retracts 20’and tilts designed for loading and moving the big portable buildings. The Cabin is about as big as anyone makes a portable building.

I was just going to buy a new 16×48 portable cabin for the lake site. They cost a whole lot more than the $12,000 I paid for the Cabin now days! Like $23,000-$25,000 now days. Even the lease to own Repos are running $20,000. There are a few companies building 16×60 portables now and those are running $34,000 plus a big oversize load transport fee. If I had the time I could build them myself for around $6500 in materials. They are not that complex just a framed, and skinned shell built on skids. Maybe next year I will build a couple or maybe I will just take a year off and fish and garden! Building the Lake and ponds and a couple of smaller projects last year, and the house/solar/Cancer this year…….. I am not feeling very relaxed or retired LOL. A nice long not have to do anything year long vacation in 2024 is sounding pretty good right now :)

 