Septic Systems | Survival Monkey Forums

0
10

In my area, to get a building permit you must first have a ‘perc test’ and a septic design. The Civil engineer that I hired to do these things charged me $150, he gave me a septic design and a cover letter stating that the design existed. The cover letter was sent along with my building application.

The septic system was very easy to do.

I have a septic tank that drains into a ‘transfer station’ [a 50-gallon drum with a pump in the bottom. The effluent then gets pumped to a leech field. Our leechfield is 20′ by 40′, with one foot of gravel spread evenly, then the drain pipes, and another foot of gravel over the top. Then landscape fabric covered it and then dirt and grass seed.

 

LEAVE A REPLY

Please enter your comment!
Please enter your name here