I am finally getting around to putting the new sawmill together and getting it up and milling. But had the ground track left from the old mill and thought Heyyyyyyy Make it a fixed and mobile mill! Soooo My idea is to weld 4 heavy screw type implement jacks on all 4 corners to lift the frame off the springs and level it and stabilize it. Make angle iron bumper to keep roll over logs from hitting the tires, once I cut the propane plate off that I forgot when I was cutting gas line, and other stuff off, it will slide right up to the tongue jack. First post oak log will cut however wide the sides are 3″ thick for a walkway to push and pull the head from. And saved $4,000 by not getting the factory trailer kit for the mill.
Where the fixed position track will go.
Can’t believe I forgot to cut the propane plate off. Ford only has a bumper hitch and I am a master at crunching the plate 
After the plate is off the will only be 12″ of overhang on the back. 20′ trailer 21′ of track.
Shrink that overhang down to a foot and no need to stand jacks under it.
Easy enough to move the mill head from old track on the trailer to new track on the concrete.
Was going to use one of the 24′ trailers but the 20′ has a heavier frame and better cross members. Can’t do the big logs on the trailer but should be able to go 20-23 inch diameter 8′ and 10′ logs on it.
Since I am getting older the step will remain 
