I always have and I always will I am the reason they created self leveling epoxy concrete surfacing!
I have seen worse…. I thought I had one more concrete job in me with the bull float, push screed and puller….. I just didn’t half way through working it I was dying and sent Mrs Krap to the rental place to get a power trowel. By the time she got back with it the concrete was setting up good and the rental trowel was old than I am and in just as bad of physical condition LOL. But It did get the ridge knocked off. The mud puddles I will have to fill with my little mixer and epoxy over in a year.
I did smooth out my foot prints after taking the picture! Not perfect by a long shot but better than spending $8,000 for a pro finishing crew.
The Pad for the Mill went a lot better than the patio. 8’x24′ 6″thick It is actually dead level with a dip on the right side to drain the water from the band lube off to the side and out. In 48 hours I will drill the holes for the inserts to bolt the ground track down with and put the track on and the head. In 28 days after it is well on its way to being cured and hard I will start milling the mountain of logs.
I am good at a lot of things, I will never be good at concrete finishing. It does not help that I absolutely hate concrete work. If I died and was given the choice of eternity in hell or 30 years of working concrete….. I would choose HELL!!!