Back to working on the house finally.

0
15

LOL when I had to stop working on it last November I sure did leave a mess. Not a trash mess but a tools scattered all over the site mess and having to figure out what I was doing and where I left off. LOL the order of things and how the layers have to go in in a specific order. It only tool 3 days to get all centered and things and thoughts organized again!

The two biggest and hardest jobs that were left is spanning the Master Bedroom with the rafters and getting the post and beam that they have to rest on up. I did the post and beam today. I used temp treated 6×6 post and a temp beam built out of 2x6s and right off the bat made a error.

This is pretty much the face I make when it dawns on me I did something REALLY DUMB and have to pry it apart after putting 600 nails in it so it will be there for all time….. At least I didn’t use liquid nails A 1×6 was supposed to go in the groove NOT a 2×6
That look I make.

On the bright side I got a good board that I hope does not fall off a trailer on the trail the trespassers like to use!
DSC00194.JPG

No getting around the post being heavy and the 2x6x16s heavy and clumsy to maneuver around. I used the simple trick of crossing boards on the post to hold them plumb while I got the beam built and the first two rafters across. The challenge here is I am doing all of the work by myself and the Master bedroom being 16’x20′ is a real challenge to span with the rafters and to get beam square and straight. The top gap on the walls is intended a 1×6 is going to cover the gap behind the plywood and is needed for how I am going to do the ceiling. Why Skin the walls with plywood on laterals. BECAUSE IT IS EASY and I hate drywall :) I really do hate drywall but there is logic behind my wall madness :) I have to wait a year for the Red Oak 1x8s to cure, dry down and shrink. They are real wet and will take every bit of a year stacked in the shed with fans on them before they are ready to run through the planer/sander and across the table saw to angle the edges like / so they fit together nice and snug on the wall. So the plywood walls are what I have until then. The walls also need backing and I got this 1/4″ plywood for $3 per sheet, no idea why but home depot had two full stacks of it marked down 2/3s off and I snagged both bundles of it. I am using R24 Insulation bats inside of every interior wall and compartmentalizing them for heating and cooling. The Master Bedroom and my corner office are going to share a 22btu Mini Split with 2 heads. The Living room and Kitchen are getting a 30k BTU with 3 heads. The Laundry room and bathroom get nothing except a space heater and whatever cool comes in from the living room. The laterals under the plywood….. You can’t screw 1x8s to studs :) Unless you put them crossways but I am putting them up and down so laterals are the right prescription. So R24 Bats, skinned on wither side with 1/4″ plywood and a 1″ air gap on either side between laterals and insulation and finally 2 inches of red oak on either side. Each room will be very well insulated and very little if any sound will make it through the walls. I am going to skin the ceiling with plywood as well but don’t need laterals up the as the 1x8s will be going across the rafters. Filling between the rafter with R30 Rolls and topping it with 3/4″ OSB. Getting the bundle of OSB into the loft is the single biggest and hardest job of the house project……. THAT KRAP IS HEAVY and 38 sheets have to get thrown up on the rafters to make the floor.
DSC00189.JPG

There are going to be 3 rooms in the center of the loft, A pair of 10×12 Kid bedrooms on the South End and 12×20 play/rec/tv room on the North half. 1200 Sq Feet on the first floor and 480sq feet of rooms in the loft down the center end to end. Loft is great for kids at 6′ high ceilings and total head buster for me at 6′ 3″ tall LOL. I would have liked to have gone 7′ but my Truss Stretcher Broker and without it 6′ was all I could get. Mini Me says she will only be 5′ 7″ when she is all grown up and she has claimed the end loft bedroom as her own!

What I started out with….. Was a Open sided hay and catch all barn I built in 2012.
DSC02750.JPG

After I closed the side and put the doors and windows in and poured a 6″ Concrete floor……
DSC03544.JPG

To where it is now….. Its easy to forget just how much I have got done and think only of how much there is left to do. It will take me another 6 months to completely finish it except for the Red Oak and Pecan walls and ceilings, I just wont put it up green and have to deal with the shrinkage on the walls and fresh milled red oak smells like rotten ass LOL.

I am not afraid to talk Money and Cost :) I budgeted $65,000 for the DIY build to finish. I have absolutely everything now to completely finish the build and tallied up all of the receipts today. I brought it all in for $53,860. Real Estate Friend looked it over and the plans for finished and put a $255,000 value on it if I were to list it. Then saw the Red Oak and Pecan and adjusted the value to $345,000 because that stuff is ungodly expensive. A Contractor friend gave me a quote on what he would charge to build it and it was pretty much $200,000 even if I supplied the oak and pecan. I have no intention of ever selling it but was curious of its value and what I have saved building it myself.

I strongly suggest that if you are NOT a Very Carpenter, a Good Electrician and fair Plumber and already have all of the tools to do the build yourself………. That you hire a contractor to do the build. The Country Side is full of homestead/farmsteads with half finished houses that ran out of skill or money or both. I have looked at buying a couple and declined after see all the problems that would have to be fixed to get the build back on track. My County is No Zoning, No Codes, and No Permits needed. MOST of the Country is no longer like that. The only two things I have to get permits for and inspections are drilling wells and installing septic tanks and those permits and inspections are $15 and from the Health Department. And since we usually don’t have a environmental health guy, its usually send them the $15 and they send you the permit minus the inspection. Every four years like clockwork the City gets Zoning out in the County on the Ballot and Annexing most of the County into the City. Every four years like clockwork we vote both down hard with about 80% consistently voting NO. That being said I do try to keep with the State Building, Electrical and Plumbing Codes. Most of those codes are just good practice and common sense, the ones that are just idiotic regulation for the sake of regulation…… I just ignore. LOL like screens in windows and doors mesh size…… If I followed code I may as well put a sheet of plywood in the window and call it a screen…. thats about how much airflow you get through that tiny mesh mandate. Or Code wants 2x10s for rafters that will be a loft or upstairs floor. Sistered 2x6s are just fine when the biggest load bearing span is 48″ Not a reason in the world to use 2x10s for those short load bearing spans. IF I were spanning more than 10′ I might use 2x10s or 2x12s. I did the cabin lost rafter which is a 16′ span with 2x6s and doubled every other rafter and topped it with 3/4 OSB and can jump up and down on the loft floor and get zero spring or bounce. But because Mini Me will be living in the house loft, I am doing 12′ doubled and 12′ tripled every other one. and single 2x6s off to the side of the 12′ Wide Central loft. The sides of the central rooms are just maintenance craw spaces and will hold my weight and tool bag easily. But we are only talking 9′ wide spans on either side of the center rooms.

So looking at it objectively I have gotten a long way in a reasonable amount of time cosidering I have done 99% of it by myself :) LOL obviously not my first rodeo but it is my last rodeo. I just don’t have building another house in me after this one is done. This is the one I will finish out my life in, so I am doing a lot of custom stuff and hidey holes that I won’t go into again.

 